Customization: | Available |
---|---|
Insulation Level: | H, F, B |
Certification: | ISO9001, RoHS |
Still deciding? Get samples of US$ 6/kg
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Paper covered aluminum flat wire inspection report | |||||||
Specification: 5.00×10.60 | Refer to the standard :GB/T7673.3-2008 | Lot number :2013-08-03 | |||||
inspection item | standard request | UNIT | the result of actual measurement | single conclusion | |||
SIZE | Maximum outside diameter | 5.500×11.120 | mm | 5.432×11.074 | up to standard | ||
thickness | ±0.050 | mm | 4.994 | up to standard | |||
width | ±0.070 | mm | 10.598 | up to standard | |||
exterior | Wrap evenly around the conductor, paper The belt should not be missing layers, should not rise Wrinkles, cracks and other defects |
no defect | up to standard | ||||
insulation thickness | 0.405---0.45----0.50 | mm | 0.438 | up to standard | |||
Conductor resistivity(20°C) | aluminum≤0.02785 | U.mm² /m | 0.02774 | up to standard | |||
elongation | ≥17 | % | 34% | up to standard | |||
Lapping overlap | ≥2 | mm | 2.2 | up to standard | |||
Winding, bending | bilateral consultation | No warping | up to standard | ||||
package | meet a criterion | up to standard | up to standard | ||||
conclusion | up to standard |
FAQ
Q1.Are you trading company or manufacturer?
A:We are factory.
Q2.How Can I order?
A:You can directly place an order on our shop in Made-In-China web. Or you can tell us the model no of the products you like, then we will send you the quotation.
Q3.How does your factory do regarding quality control?
A:Quality is priority. Our people always attach great importance to quality. Controlling from
the production beginning to the end. We have well-trained and professional workers and strict QC system in each production link.And each product has to be 100% inspected before shipment.
Q4.What are the terms of payments?
A:We accept 50%TT+50% Balance etc.
Q5.What's your delivery time?
A:In general,the delivery time is within 7days after payment. We'll make the delivery as soon as
possiable with the guaranteed quality. aranteed quality.